Repaint concrete vats
|
|
|
|
Receival pit update
|
|
|
|
Cleaning the vats before epoxy process
|
|
|
|
A vat after lining
|
|
|
|
Temperture control system being installed
|
|
|
|
|
Temperature control
|
|
|
|
Tanks arrive
|
|
|
|
Tanks off-loaded
|
|
|
|
Tanks in place
|
|
|
|
Tank installation
|
|
|
|
|
100 hectolitre tanks ready for installation
|
|
|
|
Vaslin Bucher destemmer
|
|
|
|
Vaslin Bucher pneumatic press arrives
|
|
|
|
Vaslin Bucher pneumatic press arrives
|
|
|
|
The receival trailer which feeds the destemmer
|
|
|
|
|
Destemmer connected to the harvest pump
|
|
|
|
150 hectolitre tank being installed
|
|
|
|
100 hectolitre tank being installed
|
|
|